Rebuild Design Program

Rebuild on the Property You Call Home.

A clear, coordinated path from property review and home selection through permits, construction and delivery.

Foundation footings and stem walls at 509 W Altadena Drive
01 · Foundation complete
Completed concrete slab at 509 W Altadena Drive
02 · Concrete slab complete
First-floor framing and shear walls at 509 W Altadena Drive
03 · First-floor framing
Second-floor framing at 509 W Altadena Drive
04 · Second-floor framing
From property to possibility

One property.
A clear new direction.

The rebuild journey begins with the realities of the property, moves through a defined design direction, and becomes visible through documented construction progress.

Original property photograph at 509 W Altadena Drive before construction
01 · Existing Property

Start with the property.

We review access, existing conditions, neighborhood context and the homeowner’s priorities.

Proposed design rendering for 509 W Altadena Drive
02 · Design Direction

Shape the right home.

The home series and architectural direction respond to the site and the way the family wants to live.

03 · Active Construction

Build with visibility.

Approved plans move into coordinated construction with progress, quality and milestones documented.

Property review

What we review first.

A focused early review helps identify a practical direction before detailed design and engineering begin.

Architectural plans and scale model concept image
Property + Design ReviewSite conditions, planning requirements and homeowner priorities considered together.
01Lot & Configuration

Dimensions, orientation and usable building area.

02Zoning & Setbacks

Height, coverage and required yards.

03Existing Conditions

Utilities, grading, trees and visible site factors.

04Access & Parking

Driveway, garage relationship and construction access.

05Home Priorities

Target size, rooms, lifestyle and design direction.

06Budget & Timing

Early priorities shaping scope and sequencing.

A coordinated path

Five steps from review to delivery.

Each stage creates the information needed for the next—helping major decisions become visible at the right time.

Your rebuild path · 01–05
Original property photograph at 509 W Altadena Drive before construction
01Property
Review
Site + goals
Proposed design rendering for 509 W Altadena Drive
02Design
Direction
Home concept
Architectural plans and scale model concept image
03Plans &
Budget
Scope + cost
Architectural plans and scale model concept image
PERMIT REVIEWEngineering · Agency Coordination
04ApprovalsEngineering + permit
Current site progress and framing documentation
05Build &
Deliver
Construction + handover
01

Property Review

Understand the site, goals and initial opportunities.

Stage resultInitial property direction
02

Design Direction

Select the right home series and architectural character.

Stage resultPreliminary home concept
03

Plans & Budget

Develop drawings, scope and a more defined budget.

Stage resultCoordinated drawings & scope
04

Approvals

Coordinate engineering, documentation and permit review.

Stage resultPermit-ready documentation
05

Build & Deliver

Manage construction, selections, quality and completion.

Stage resultCompleted residence
Choose the right starting point

Three home series. Different ways to live.

Home series provide a disciplined starting point—not a one-size-fits-all result.

A20 single-story exterior design rendering

A20

Efficient Single-Story · 1,800–2,100 SF

Single-level living with efficient circulation, strong indoor-outdoor connection and controlled scale.

B23 two-story exterior design rendering

B23

Compact Luxury · 2,200–2,450 SF

A balanced two-story direction for narrower properties and families seeking more space without excess.

B26 two-story exterior design rendering

B26

Family Residence · 2,560–2,635 SF

A larger family-focused home with flexible bedrooms, generous gathering spaces and elevated details.

Clear responsibilities

Better decisions through better coordination.

Complete 509 home exterior composed for the responsibilities section

You

  • Share property information and priorities
  • Describe how you want to live
  • Review the proposed design direction
  • Approve major project decisions
  • Select finishes and upgrades
Current site progress and framing documentation

Building Together

  • Review the property and coordinate design direction
  • Coordinate architect, engineering and permit documentation
  • Develop project scope, budget and milestone schedule
  • Coordinate selections, procurement and construction activity
  • Manage inspections, quality reviews and progress records
  • Coordinate final walkthrough and punch-list completion
  • Prepare handover documents and available warranty information
Real work. Documented progress.

Construction you can see and understand.

Progress images and structural details help turn an unfamiliar process into visible, accountable milestones.

Progress at each stage

Framing, platforms, stairs and structural work are recorded as the home takes shape.

Quality behind the finishes

Shear walls, beams, headers, hold-downs and structural connections matter long before the completed interiors are visible.

Different properties. Different responses.

Five projects shaped around real sites.

Each property begins with different dimensions, constraints and priorities.

Proposed design rendering for 509 W Altadena DriveUnder Construction

509 W Altadena Drive

B26-S · 2,635 SF · 5 Bed / 4 Bath

A five-bedroom family residence balancing everyday function, refined curb appeal and documented construction progress.

Owner-supplied proposed exterior rendering for 63 W Loma Alta Drive with arched entry, dark roof and balconyDesign Direction

63 W Loma Alta Drive

B26-G · 2,618 SF · 4 Bed / 4 Bath

A hillside-oriented design shaped around privacy, balconies, outdoor living and the character of the larger property.

Design rendering for 70 W Mendocino StreetPermit & Planning

70 W Mendocino Street

B23 · Approx. 2,365 SF · 4 Bed / 4 Bath

A compact two-story residence using an efficient footprint to preserve practical living space and site usability.

Design rendering for 560 W Loma Alta DrivePrototype Design

560 W Loma Alta Drive

B26-M · Approx. 2,560 SF

A B26 prototype balancing a larger family program with a disciplined footprint and a refined two-story exterior.

Design rendering for 160 W Palm StreetSite Planning

160 W Palm Street

B23 · Approx. 2,356 SF · 5 Bed / 4 Bath

A corner-property design coordinating the main entry, connected side garage, turning court and private yard.

Common questions

What homeowners usually ask.

Owner-supplied proposed exterior rendering for 63 W Loma Alta Drive with arched entry, dark roof and balcony
Why rebuild with Building TogetherProperty-specific feasibility reviewProven home designs with room to personalizeCoordinated design, permitting and constructionDocumented progress, quality reviews and handover
Can I rebuild on my existing property?

The initial property review helps identify a practical direction. Final feasibility remains subject to survey, engineering, agency review and detailed documentation.

Do I have to select a fixed floor plan?

No. A20, B23 and B26 provide structured starting points, while the final design responds to the property and approved project scope.

When will I receive a preliminary budget range?

Early ranges become more defined as the home direction, site conditions, drawings, engineering and selections are developed.

Who coordinates the architect, engineering and permits?

Building Together coordinates the project team and documentation process while keeping the homeowner informed at major decision points.

What conditions can affect final cost and timing?

Grading, utilities, access, retaining work, engineering requirements, agency review and owner selections can all affect final scope and schedule.

Start with your property

Let’s explore what your home could become.

Share a few details and begin with a focused property conversation—without pressure or obligation.

Initial property conversations are exploratory and subject to site review, design feasibility and mutually agreed project terms.